HYC Page Twenty Three
Photos taken 2-29 & 3-01


Although nothing has been done since Friday, I noticed this new electrical 
distribution box had been installed just beyond the Tom Brady building.
 This will be for some of the new docks.

 
The space between the old bulkhead and the new one is being filled with sand. 
The utilities have been installed which will be covered.


The electrical conduit is visible as well as the leads to one of the light stanchions.


The new small boat launching crane will be located here. The old one was out
 on a short pier which was in really bad condition. A concrete pad will be
 poured over the pilings you an see in the hole.


Some of the remaining pilings on the barge. I'm not sure if this will be all of
the concrete pilings or not.


The barge was moving up close to the bulkhead in preparation for setting the
pilings for the new E dock. The spuds for the barge are Long!


This large float had just been set in the water from being unloaded. It will be
positioned at the inboard end of the new E Dock.


This is one of the finger piers that had just been off-loaded from the truck. These
workers are preparing to attach the corner braces. It's much easier to do this now
than after it's in the water.


The brace on the right has been attached and the left one is being fastened
 as we watch. This will be repeated many times in the next weeks.

Return to welcome page.