HYC Page Twenty Four
Photos taken 03-03-04


The pile driver  is driving in a pile on the new E Dock. As you  can see, there is not
much room between the pier and the old Jones pier on the left. These slips will
be parallel parking alongside of the pier. I can already see where my little
boat will be going!


The pile driver is being lowered as the barge has to be moved to
finish up on this pier. I think he had to put in a few more on the outer end.


The barge has raised a spud in preparation for being moved farther out. You an see
that the remaining piers are all in place.


B Dock already has most of the south side finger piers installed. The remaining
float alongside of it will be the courtesy dock and it will be located along the
bulkhead right in front of the dining room.


Meanwhile, back at the ranch.......work goes on. This form was mentioned on the
previous page. This will be a concrete pad for the new small boat hoist you
can see in the background.


This is the bulkhead crew applying finishing touches to the fill along the
new bulkhead. It will be allowed to settle before the pavers are
put in to bring the surface up to the top of the bulkhead cap.

It's starting to look REAL GOOD!