HYC Page Twenty Six


The bulkhead work has resumed with the arrival of replacement
sheet piles.


The small boat hoist base pad work appears to be finished
as is ready for the hoist once the concrete has cured.


The crane has set in three wood pilings on the outer slips on the right
and is preparing to move toward us. They will work inward setting
the wood pilings on the right. Then they will begin placing the north
 finger piers alternating with the wood pilings as they work outward.


The crane is using the vibrating pile driver to set in the wood piles between
 the finger piers.


This one is ready to go down.