HYC
Page Twenty Seven
Photos taken
03-09-04

When I arrived at the club today around 1:20, the barge
was right up
against the bulkhead. All of the wood pilings had been driven along C Dock
as well as three right along the bulkhead. These will anchor the courtesy dock
along the bulkhead. Here the far piling had just been cut to the proper height.

This shows all of the pilings along C Dock and the next
one to be cut
in front of the worker on the left.

Right after the three pilings were cut off behind the
clubhouse,
the barge backed out, trimming off the pilings between the finger piers
on C Dock as it went out. The transit in the foreground was used to mark
the cutting line on the pilings.

The remainder of the bulkhead work is progressing nicely.
At the rate
they are going, they could be finished with the sheet pilings by the end
of this week or middle of next week.