HYC Page Thirty
Two
Photos taken 3-18-04

If you haven't been to the club in awhile, you are in for
a pleasant surprise.
This is our new entrance. The all dark glass front is pretty classy!

This is the view from the foyer. The double glass doors
open wide to allow
the widest of wheelchairs easy entrance. I think a ramp is is the near future.

This may be the last time you will see this scene with no
boats! As you can
see, the last of the finger piers on B-Dock and C-Dock have been
installed.
The last two on B-Dock (right ) are longer. The concrete pilings on the
end of the finger piers were the last to go in.

D-dock and E-Dock are almost finished. The T-head is in
place on D-Dock the
last finger is being worked on back on E-Dock.

I'm not sure, but it appears the crane may be finished
setting pilings.

This is the template for locating the mounting bolts for
the new crane.

The base for the new crane has had a lot of new re-bar
added. This will be
a much larger crane with a capacity to lift around 8000 pounds!
Return to welcome page