Photos taken 03-23-04
Every day, a few more boats come back.


Preparations are being made to to build the ramp
platform for E-Dock. 


This shot really gives us a good idea of  how high
the concrete pilings are! The piling caps are being installed.


This jumble of wires is just some of the wiring that has to go through the
conduit in the floats to provide electrical service to all of the boats.
When you consider that each service tower provides two 30 amp
outlets, that's a lot of power and it takes a lot of wire.