Photos taken 04-22-04


There was a lot of activity at the club today. This crew is preparing the areas which will get
pavers. The walkway along the new bulkhead as well as the area between the club house
and the Brady Junior Shack will be done in pavers.


The CAT is putting gravel down as a base for the pavers. This will then be compacted and
 covered with sand which will also be compacted.


A look out at the new docks from the dining room porch shows us that there are very
few empty slips. What a pretty view!



Another view looking more to the North.


These are the folks who made our nice new docks. This tile is located on E-Dock.


This area will be done in pavers. It has been covered in packed gravel and this will be
covered with sand.


Project engineer Phil has keep a watchful eye on the entire project from it's
inception. You can be sure nothing has been done without him being aware of it.


Back to the front of the club, this crew is putting in the forms for the concrete landing
at the top of the ramp.


In case you might have missed it, the large hoist
has been installed and it's BIG!
Like the small one, it turns very freely and pivots in the wind like a large wind sock.


This view is looking toward the clubhouse from E-Dock. As I said, the hoist
is pretty large!