Photos taken 2-09-04

The dredge is working right in front of the club today. This is
about where Smoking Gun's slip used to be.

The barge is becoming pretty well loaded. When it came time
move it, it appeared to be on the bottom.

The tug is leaving with the barge. It will be dumped and
ready to be filled up again the next day.

photo thanks to Phil Briggs
This is the re-enforcing pad on the North side of the
small boat crane.
The re-bar is in place as well as the concrete forms. This new pad is being
poured on top of the I-Beam pilings that were driven in here earlier.

photo thanks to Phil Briggs
Concrete is being poured into the crane re-enforcing
abutments.

The completed work on the crane base.